
Ness
Forum Posts: 1939
Subscriber Since:
October 4, 2012
October 4, 2012
Thanked 547 times in 1939 posts
Reputation: 23381

Hi Ain,
You have to use Biesse Works.
When you load the file into Biesse works you must Optimise the machine program and set the "Optimise" options to "minimum time".
This forces Biesse Works to see if the holes are lined up at 32mm and it should automatically use the drilling head.
Without optimisation the machine will drill one hole after the other.
If this doesn't work it might be that the drilling head configuration of the machine has been changed and the drilling on from Polyboard that is lined up doesn't match the head config that has been modified.
All the best,
Ness
Forum Timezone: Europe/London
Most Users Ever Online: 256
Currently Online: Ashraf Akrim, Mohammed Elalami, Jovanovic Nebojsa, Nguyễn Công Trường, ROBERT WENTZEL, ahmed ibrahim, Chanaka Jayakody, james cacota, ngiru wings, Rodolfo Silva, achuy, Carl Dentith, andy leon, David Fobes
Guest(s) 1
Currently Browsing this Page:
1 Guest(s)
1 Guest(s)
Top Posters:
terry: 253
mark nichols: 157
Tom Cleaver: 150
Kerf Works: 143
Conor Devoy: 132
Duayne Naugle: 129
brendan kavanagh: 112
jimbouk: 105
Syslab Corp: 103
Stu Robertson: 102
Newest Members:
David Fobes
Bart James
JUAN GUILLERMO MESA
Muharrem Allmuca
Hanan Muhammed
Hanan Muhammed
Juozas Martinkus
Emil Dan
patrick nedzlek
Aron barta
Forum Stats:
Groups: 2
Forums: 7
Topics: 1861
Posts: 10247
Member Stats:
Guest Posters: 4
Members: 153022
Moderators: 0
Admins: 12
Administrators: Ness, Stefan, Michel, Carole, Alex, admin, Laly, ipatrick, Fatima, Crystal, Jem Turner, Darren